top of page
Biomass Boiler Plant for Heineken Factory

Client
BECIS
Period
Jan 2022 – Sep 2022
Description of works
Main contractor for civil, structure, architecture and MEP of a biomass steam boiler plant (15 t/h Vyncke boiler, Belgium): steel building structure, weighbridge, pipe bridge, horizontal directional drilling under the road for a 500 mm steam pipe, Form 4b type-tested main distribution boards and a pressurised electrical room.
bottom of page