Chang Beer Factory, Suvannaphum SEZ, Phnom Penh

Client
ThaiBev (Chang Beer Factory)
Period
Jul 2024 – May 2026
Description of works
MEP package (2 floors; 100,991 m² site, 24,224 m² building): chiller air-conditioning, AHU/OAHU, ventilation, cooling tower, ducting, diesel fire pump, Novec 1230 clean agent, water and wastewater systems, 2 × 1,500 kVA transformers, distribution boards, 300 kVA UPS, lighting and power, fire alarm, CCTV, computer network, lightning and earthing, PIMS system, laboratory pass box, air shower, overhead crane, 40–50 t truck scale and chemical tank.
Interior work package.