top of page
CTN TV Studios – New Power Supply

Client
Cambodian Broadcasting Service (CBS) / CTN
Period
Aug 2022 – Dec 2022
Description of works
Design and build of an 800 kVA power plant with EDC substation and switching power house for 2 generators (500 kVA + 300 kVA, Cummins engines with Stamford alternators) and a synchronised control panel. Existing power consumption surveyed with a HIOKI (Japan) power analyser.
bottom of page